Total Water Consumption was 6854 units

GENERAL WORK

Total Complaints:

Electrical 1780

Plumbing 1274

AC 1182

Carpentry 1178

Paint 380 Rooms Touch up, 38 Ceiling repair paint, Door polishing project Running from 1st floor to 5 Floor.

From HK, Rec and QMS Compliments Total 1826

Major Project:  

  • Free sockets in the room for Classification visit Total 55 Rooms.
  • Free Sockets in the bathroom for Classification visit Total 55 Rooms.
  • Liquid dispenser project for quality 490 Rooms 3*490 dispenser.
  • Door polishing project all hotel guest room, (Starting from 1st floor).
  • Windows stickers 55 rooms remains previous project.
  • Evacuation plan (42 Room) Project completed.
  • Room rate plats (42 room) Project completed.
  • Signage updates all hotels for classification visit.
  • Handicap bathroom fix access for classification visit Total 12 Bathrooms.

Company Work.

Changed header from Pump room B5. Al Fanniya

Repair Leakage Riser no 5/6 Al Fanniya

Change smoke detectors and rectified fire alarms faults total 12 Al Fanniya

Changed emergency battery from services lift KONE Company.

Clean grease tank and sewage tank by Aryaf Al Hizaz Company.

Sheeb Al Jazeera Company make repair floor epoxy from Ramp main car parking entrance

All Company completed their Monthly visit.

Challenged Operation.

Bypass big Shidler sky light.

Vacuum pit water from services lift.

Repair supply line from B5 transfer pump

Repair dish washer machine B1 back area.

Classification Visit.

Cristal Visit.

Upcoming challenge operation.

Civil Defense Visit.

Best Regards

Mohammad Masoud / Maintenance Manager